New Arrival China Contactor Telemecanique Type 660v - LC2-K Revising Contactor – Simply Buy Detail:
Type |
Rated working current A(380V) | 220V |
AC-3 use group control power (kW) 380V~415V 440~500V |
660V | Contact data(1) | |||
LC2-K06 |
6 |
1.5 |
2.2 |
3 |
3 |
3P+NO 3P+NC | ||
LC2-K09 |
9 |
2.2 |
4 |
4 |
4 |
3P+NO 3P+NC | ||
LC2-K12 |
12 |
3 |
3 |
5 |
5 |
3P+NO 3P+NC |
Specifications LC1-K06 LC1-K09 LC1-K12 | |||||
Use group under AC-3 |
6 |
9 |
12 |
||
Rated working current(le)A |
5 |
7.5 |
10 |
||
Conventional thermal current(lth)A |
16 |
20 |
20 |
||
Rated working voltage(Ue)V |
380 660 |
||||
Rated insullation voltage(Ui)V |
690 |
||||
AC-3(6le le) | Electrical life(time) |
0.5×106 |
|||
Operation frequency h-1 |
1200 |
||||
AC-3(6le le) | Electrical life(time) |
10×104 |
|||
Operation frequency h-1 |
300 |
||||
Mecnical life Auxiliary contact | Conventional thermal current |
3×106 6A |
|||
Electrical life(time) | AC-15(360VA) |
0.5×106 |
|||
DC-13(33W) | |||||
Coil specifications | Rated control voltage(Us) | AC: 12, 24, 45, 110, 220, 380 | |||
DC: 12, 24, 45, 110, 220 | |||||
Pick-up voltage | AC: 0.85~1.1Us DC: 0.85~1.1Us | ||||
Resleasing voltage | AC: 0.2~0.75Us DC: 0.2~0.75Us | ||||
Coil power VA | Pick-up |
40 |
|||
Fotain |
4 |
||||
Consumption |
1.2W |
||||
Pick-up time |
6~18ms |
||||
Releasing timePower factor |
5~23ms Making 0.8 Breaking 0.3 |
AC operating coils
Maximum Horsepower Ratings | Maximum Current | Type of Connection | Auxiliary Contacts | Catalog Number |
|||||||
1 Ø | 3 Ø | Inductive AC3 Amperes |
Resistive AC1 Amperes |
||||||||
115 V hp | 230 V hp | 200 V hp | 230 V hp | 460 V hp | 575 V hp | N.O. | N.C. | ||||
0.5 | 1.5 | 1.5 | 1.5 | 3 | 3 | 6 | 15 | Screw-clamp | 1— | —1 | LC1K0610 LC1K0601 |
0.5 | 1.5 | 2 | 3 | 5 | 5 | 9 | 20 | Screw-clamp | 1— | —1 | LC1K0910 LC1K0901 |
0.5 | 1.5 | 3 | 3 | 7.5 | 10 | 12 | 20 | Screw-clamp | 1— | —1 | LC1K1210 LC1K1201 |
Coil voltage codes for AC contactors
Volts AC 50/60 Hz | 12 |
24 |
42 | 48 | 110 | 120 | 127 | 200/ 208 |
220/ 230 |
230 | 230/ 240 |
277 | 380/ 400 |
400/ 415 |
440 | 480 |
Code | J7 |
B7 |
D7 | E7 | F7 | G7 | FC7 | L7 | M7 | P7 | U7 | UE7 | Q7 | N7 | R7 | T7 |
DC operating coils
0.5 | 1.5 | 1.5 | 1.5 | 3 | 3 | 6 | 15 | Screw-clamp | 1— | —1 | LP1K0610 abLP1K0601 ab |
0.5 | 1.5 | 2 | 3 | 5 | 5 | 9 | 20 | Screw-clamp | 1— | —1 | LP1K0910 abLP1K0901 ab |
0.5 | 1.5 | 3 | 3 | 7.5 | 10 | 12 | 20 | Screw-clamp | 1— | —1 | LP1K1210 abLP1K1201 ab |
Overload relays for 3-Pole contactors with screw-clamp terminals
Class 10, Relay setting range–A | Catalog Number | |
0.1 to 0.16 | LR2K0301 | LR2K overload relays:
|
0.16 to 0.23 | LR2K0302 | |
0.23 to 0.36 | LR2K0303 | |
0.36 to 0.54 | LR2K0304 | |
0.54 to 0.8 | LR2K0305 | |
0.8 to 1.2 | LR2K0306 | |
1.2 to 1.8 | LR2K0307 | |
1.8 to 2.6 | LR2K0308 | |
2.6 to 3.7 | LR2K0310 | |
3.8 to 5.5 | LR2K0312 | |
5.5 to 8 | LR2K0314 | |
8 to 11.5 | LR2K0316 | |
10 to 14 | LR2K0321 |
Product detail pictures:
Related Product Guide:
Nokia’s banana phone from The Matrix is back | 19mm Momentary Push Button
ZTE’s newest Blade phone features dual cameras, a glass back, and face detection | Lrd12 Overload Relay
Our business sticks for the basic principle of "Quality could be the life with the firm, and track record will be the soul of it" for New Arrival China Contactor Telemecanique Type 660v - LC2-K Revising Contactor – Simply Buy, The product will supply to all over the world, such as: South Korea , Amsterdam , Albania , Since our establishment, we keep on improving our products and customer service. We are able to provide you with a wide range of high quality hair products at competitive prices. Also we can produce different hair products according to your samples. We insist on high quality and reasonable price. Except this, we provide best OEM service. We warmly welcome OEM orders and customers all over the world to cooperate with us for mutual development in the future.
By Dinah from Greece - 2016.08.18 18:38
This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
By Frederica from Georgia - 2016.05.31 13:26